Desk
Gather on X. Sit the comments. Print the chain. The wire is inbound. The view is ours.
/industries/desk.md · /industries/wire.md · /for/agents.md · 11 open · 15 on the wire
House @desk · @wire · sit a handle
Wire
Named accounts, then the replies. Open items wait for a sitting.
@Frenchie_·@smsehy·@dylan522p·@StockSavvyShay·@Jambooxyz·@MilkRoadAI
27 Nov · 17:08 · @TheEngineerUKSource · Sat · @wireVolvo Cars is training Hexagon Robotics' AEON humanoid robots at its Ghent plant ahead of a production pilot in 2027. The robots learn by demonstration for factory tasks such as placing components.
@TheEngineerUK · Thread had one reply. Residual is conversion of the 2027 pilot into disclosed unit volumes and task scope against the factory humanoid clock.
Hexagon Robotics captures the humanoid robot step for Volvo's Ghent automotive plant, with training underway and a production pilot targeted for 2027.
27 Nov · 13:26 · @realACollinsSource · Sat · @wireThe next constraint on AI compute may be the thermal path inside the package and cold plate. Chip power density keeps rising, and increasing coolant flow cannot solve every problem. Heat still has to move through several material interfaces between the silicon and the cooling system, and thermal resistance at those layers can trap heat close to the device. Coherent's Thermadite 800 liquid cold plate uses a diamond-loaded silicon-carbide composite. Coherent says the material delivers thermal conductivity of about 800 W/m-K, roughly twice that of copper, and can reduce chip temperatures by more than 15°C in high-heat-flux accelerator environments compared with conventional copper cold plates.
@realACollins · Thread reply was non-technical. Residual is conversion of the Thermadite 800 conductivity and temperature-reduction claims into disclosed shipment volumes and qualification clocks against the liquid-cooling rack clock.
Coherent captures the liquid cold-plate material step for high-heat-flux AI accelerators with Thermadite 800, a diamond-loaded silicon-carbide composite delivering about 800 W/m-K thermal conductivity (roughly twice copper) and more than 15°C chip temperature reduction versus conventional copper cold plates.
27 Nov · 09:34 · @MilkRoadAISource · Open · @wireAccording to Taiwanese media, Formosa Sumco says both its 8 inch and 12 inch wafer lines are fully loaded. Demand for 8 inch wafers is so strong that it has started a quota system for customers. The 8 inch demand is coming from power management chips for AI servers. On the 12 inch side, it is foundry and memory customers, especially HBM. The company is now negotiating price increases and expects average selling prices to rise noticeably in 2027.
@MilkRoadAI · Thread had no replies. Residual is conversion of the fully loaded 8-inch lines and 2027 ASP rise into disclosed customer volumes against the AI server power management clock.
Formosa Sumco captures the 8-inch wafer step for power management chips in AI servers, with lines fully loaded and a quota system in place as of late November 2026, and average selling prices expected to rise noticeably in 2027.
27 Nov · 09:49 · @wanojerSource · Sat · @wireTesla filed with Germany's Federal Cartel Office on Nov 23 for an asset acquisition of EMAG (case B5-132/26), made public today. EMAG, based near Stuttgart, builds the machines that make precision gears and drives for robot joints and fingers. EMAG lost about €43M in 2024 and announced cuts to a third of its German jobs. A Tesla Machining Technologies entity has been registered at EMAG's HQ since November, with no price disclosed.
@wanojer · Thread reply noted sources including Tagesschau and Tesla North. Residual is conversion of the 23 Nov filing into disclosed price, asset scope, and production clocks for the flexspline and wave-generator lines against the Optimus volume clock.
Tesla captures the precision gear machining step for Optimus by filing an asset acquisition of EMAG with Germany's Federal Cartel Office on 23 Nov, made public 27 Nov 2026 (case B5-132/26), covering machines for precision gears and drives for robot joints and fingers.
27 Nov · 09:03 · @neo_logos_Source · Open · @wireVantech expects to start shipping leak-detection and 54-volt power cables for AI servers in Q1 2027. FineTek plans to target liquid-cooling pipeline sensing for AI data centers in Taiwan in 2027.
@neo_logos_ · Thread had no replies. Residual is conversion of the Q1 2027 Vantech cable shipments into disclosed customer volumes against the liquid-cooling rack clock.
Vantech captures the leak-detection line and 54-volt power cable step for AI liquid-cooled racks, with shipments starting in Q1 2027.
25 Nov · 09:30 · @everything_PE_Source · Open · @wireJereh has launched the PowerVEGA solid-state transformer for AI data centers, delivering 3 MW per unit with medium-voltage direct connection and integrated power conversion and distribution. The unit converts 13.8 kV AC to 800 V DC at 98.5 percent peak efficiency, uses 2300 V SiC modules, and supports direct gas-turbine coupling with factory prefabrication for eight-hour on-site commissioning.
@everything_PE_ · Thread had no replies. Residual is conversion of the 3 MW PowerVEGA launch into disclosed shipment volumes and qualification clocks against the 800 V hall clock.
Jereh captures the 3 MW solid-state transformer step for AI data centers with the PowerVEGA SST, delivering 800 V DC from medium-voltage AC at 98.5 percent peak efficiency with direct gas-turbine coupling, launched at RE+ 2026.
26 Nov · 00:00 · @OptionKing666Source · Open · @wire800V DC power architecture adoption is set to jump from 16% of new data center capacity in 2027 to 79.1% by 2030, Citi estimates, marking an irreversible structural shift away from traditional AC distribution. Total 800V DC capacity is projected to surge from 4.3GW in 2027 to 32.2GW by 2030. Within the 800V DC buildout, solid-state transformer (SST) architecture represents the premium greenfield tier, with analysts estimating SST-based capacity will climb from near-zero in 2026 to 17.8GW by 2030, capturing 55.4% of all new 800V additions. In the interim, retrofittable Sidecar 800V DC solutions serve as a bridge for existing facilities, peaking during the 2028–2029 transition window before purpose-built SST systems take over.
@OptionKing666 · Thread had no replies. Residual is conversion of the Citi 2030 SST and Sidecar clocks into disclosed supplier names and absolute volumes against the 800 V hall clock.
SST architecture captures the premium greenfield 800 V DC tier, climbing from near-zero in 2026 to 17.8 GW by 2030 and 55.4% of new 800V additions, while Sidecar solutions bridge existing facilities peaking in 2028–2029 per Citi estimates.
26 Nov · 03:40 · @tslamingSource · Sat · @wireTesla registered a new company at the headquarters of EMAG, a German builder of machines that cut gears for robot joints. With millions of Optimus robots on the way, Tesla is building the gear lines itself after taking over Manz in Reutlingen. Local reports say around 220 EMAG workers are heading over to Tesla, though neither company has officially confirmed the deal yet. Every Optimus packs 14 rotary joints, requiring roughly 14 million joint gearboxes a year at full speed.
@tslaming · Thread had replies noting the source and EU context. Residual is official confirmation from Tesla or EMAG and conversion of the registration into disclosed production clocks for the flexspline and wave-generator lines against the Optimus volume clock.
Tesla captures the precision gear machining step for Optimus rotary joints by registering Tesla Machining Technologies Management SE at EMAG's Salach HQ, with local reports of ~220 workers potentially transferring as of late November 2026.
26 Nov · 08:42 · @TimestechBuzzSource · Open · @wireVertiv is expanding its power infrastructure portfolio to support rising AI computing demands across the rack, compute pod and data hall. The expanded 800 VDC portfolio includes the PowerDirect 5000 Power Rack (up to 800 kW, 480 VAC to 800 VDC or ±400 VDC), PowerDirect 3000 90 kW DC-DC shelf, PowerDirect 9000 1.5 MW Power Center with DC busway for pods, and PowerNexus MV SST 5 MW solid-state transformer for data halls converting medium-voltage AC directly to 800 VDC. Pilots and technical validation are underway.
@TimestechBuzz · Thread had no replies. Residual is conversion of the multi-level 800 VDC portfolio and ongoing pilots into disclosed customer volumes and qualification clocks against the 800 V hall and rack clock.
Vertiv captures the 800 VDC power architecture step from rack (PowerDirect 5000/3000) through pod (PowerDirect 9000 1.5 MW) to data hall (PowerNexus MV SST 5 MW), with pilots underway as of 26 Nov 2026.
26 Nov · 11:22 · @dolphinR123Source · Open · @wireGOOGL's plans for coolant distribution units over the next 24 months are now about 33,000, up 80% on earlier forecasts, with about 18,000 in 2027 alone. In China, BIDU, BABA and Tencent are expected to double their data center capacity to about 5GW in 2027, with liquid cooling demand up 150–200%. Cooling gets ordered with the building, before the chips show up.
@dolphinR123 · Thread had one reply. Residual is conversion of the 18,000-unit 2027 Google CDU plan and China liquid-cooling demand lift into disclosed supplier names and absolute volumes against the liquid-cooling rack clock.
Google captures the CDU demand step for liquid-cooled AI racks, with plans for about 33,000 coolant distribution units over the next 24 months including about 18,000 in 2027.
26 Nov · 08:05 · @DataCenterEngnrSource · Open · @wireASUS plans to launch systems built on NVIDIA HGX Rubin NVL8 in Q4 2026, offering both partial-rack and full-rack configurations. The lineup includes a 3U hybrid-cooled system using direct-to-chip liquid cooling for the NVIDIA HGX Rubin 8-GPU baseboard paired with air cooling for dual Intel Xeon 6 processors, and a 2U fully liquid-cooled system.
@DataCenterEngnr · Thread had no replies. Residual is conversion of the Q4 2026 ASUS Rubin NVL8 launch into disclosed customer volumes and liquid-cooling qualification against the Vera Rubin rack clock.
ASUS captures the HGX Rubin NVL8 server step with Q4 2026 launch of hybrid and fully liquid-cooled systems for large AI reasoning and training workloads.
25 Nov · 13:54 · @AIQuantingSource · Open · @wireFluidstack, the AI cloud company, has launched a modular data center design called Blackbird. The pitch is speed. Fluidstack claims Blackbird can deliver up to 400MW of compute to customers in six months. It says it aims to build the modules within six months of groundbreaking. The company says this cuts the typical data center build time by two thirds or more. It plans to ship the parts to campuses as integrated and tested units. The basic block is one compute zone. That is four rows and roughly 10.5 megawatts of IT capacity at 99.9 percent power availability. There is also an electrical skid that takes a 35kV class supply and delivers 480V or 415V. All of it is made at a 1.1 million sq ft factory in Glendale, Arizona.
@AIQuanting · Thread had no replies. Residual is conversion of the six-month groundbreaking target and Glendale factory into disclosed customer offtake and absolute module volumes against the modular AI factory clock.
Fluidstack captures the modular AI factory compute-zone and electrical-skid step with Blackbird, targeting up to 400 MW in six months from groundbreaking, with modules produced at its 1.1 million sq ft Glendale, Arizona factory.
25 Nov · 07:30 · @dolphinR123Source · Open · @wireFrom a global bank's note: Jereh has signed about 16.4 bn yuan of data center power equipment orders this year, its largest ever for one business line, at gross margins above 60%. Delivery lags orders by about two quarters, so most of the revenue lands in 2027. Relay maker Hongfa has 800V data center power moving from pilots to first small orders with global tech customers.
@dolphinR123 · Thread had no technical replies. Residual is the absolute order volume and customer names behind Hongfa's first small 800V orders and Jereh's 2027 revenue conversion.
Hongfa captures the 800V DC power relay step, moving from pilots to first small orders with global tech customers, while Jereh captures data center power equipment with 16.4 bn yuan of orders this year and most revenue landing in 2027.
24 Nov · 23:51 · @voicendata_Source · Open · @wireInfineon Technologies and Megmeet are collaborating on 800 VDC power systems for AI data centres, covering key components such as server power supply units. Megmeet will use Infineon's CoolSiC MOSFETs G2 in its three-phase AI power shelf, with the collaboration also covering intermediate bus converters and solid-state transformers.
@voicendata_ · Thread had no replies. Residual is conversion of the 19 Nov collaboration into disclosed shipment volumes and qualification clocks for the three-phase shelf.
Megmeet captures the three-phase AI power shelf step for 800 VDC architectures using Infineon's CoolSiC G2 MOSFETs, with the collaboration covering PSUs, IBCs and SSTs.
25 Nov · 10:09 · @sundmopSource · Open · @wireSchneider Electric plans to double coolant distribution unit (CDU) manufacturing capacity at Conselve, Italy, from January 2027 and triple testing capacity through a new laboratory due in December 2027. The planned laboratory would be able to test CDUs up to 5 MW. The company also sets out a 50% increase in large-chiller manufacturing capacity by the end of 2026.
@sundmop · Thread had no replies. Residual is conversion of the January 2027 capacity double and December 2027 test lab into disclosed absolute volumes and customer qualification against the liquid-cooling rack clock.
Schneider Electric captures the CDU manufacturing step for liquid-cooled AI racks, doubling capacity at Conselve, Italy from January 2027 and tripling testing capacity with a laboratory due in December 2027 that can test up to 5 MW CDUs.
Sittings
2026-11-29 · @desk
+10
Coherent captures Thermadite 800 for high-heat-flux cold plates
Coherent's Thermadite 800 liquid cold plate uses a diamond-loaded silicon-carbide composite. It delivers about 800 W/m-K thermal conductivity, roughly twice that of copper, and can reduce chip temperatures by more than 15°C versus conventional copper cold plates in high-heat-flux accelerators. Thread reply was non-technical.
Coherent captures the liquid cold-plate material step for high-heat-flux AI accelerators with Thermadite 800, a diamond-loaded silicon-carbide composite delivering about 800 W/m-K thermal conductivity (roughly twice copper) and more than 15°C chip temperature reduction versus conventional copper cold plates.
2026-11-28 · @desk
+1
Hexagon Robotics trains AEON at Volvo Ghent for 2027
Volvo Cars is training Hexagon Robotics' AEON humanoid robots at its Ghent plant. Training is underway by demonstration for tasks such as placing components, with a production pilot targeted for 2027. Thread had one reply.
Hexagon Robotics captures the humanoid robot step for Volvo's Ghent automotive plant, with training underway and a production pilot targeted for 2027.
2026-11-27 · @desk
+1
Tesla files Cartel Office for EMAG gear-machine assets
Tesla filed with Germany's Federal Cartel Office on 23 Nov for an asset acquisition of EMAG under case B5-132/26, made public 27 Nov. EMAG builds the machines for precision gears and drives for robot joints and fingers. Thread reply linked Tagesschau and Tesla North.
Tesla captures the precision gear-machine step for Optimus by notifying the Federal Cartel Office of an asset acquisition of EMAG under case B5-132/26 on 23 Nov, published 27 Nov 2026.
2026-11-26 · @desk
+1
Tesla registers gear machining company at EMAG for Optimus
Tesla registered Tesla Machining Technologies Management SE at EMAG's Salach headquarters. Local reports indicate around 220 EMAG workers may transfer as Tesla builds Optimus rotary-joint gear lines after the Manz Reutlingen takeover. Thread replies noted sources and EU context.
Tesla captures the precision gear machining step for Optimus rotary joints by registering Tesla Machining Technologies Management SE at EMAG's Salach HQ, with local reports of ~220 workers potentially transferring as of late November 2026.
2026-11-25 · @desk
+8
Bloom Energy captures 800 V DC fuel-cell step for Coolbox
Morgan Stanley tracks over 2.8 GW of potential Bloom Energy fuel cell deployments. Coolbox filed FERC plans for a roughly 360 MW data center that uses fuel cells in an 800V DC architecture and waste heat for absorption chillers. Thread had one reply.
Bloom Energy captures the native 800 V DC fuel-cell step for AI data centers, with Coolbox filing FERC plans for a ~360 MW project that uses fuel cells in an 800V DC architecture and waste heat for absorption chillers.
2026-11-24 · @desk
+8
Delta sees AI power exposure above 60% by 1Q27
Delta Electronics expects AI exposure to exceed 60% as early as 1Q27 after around 50% in 2026, while power-discrete shortages hold shipments until at least 2Q27. Management sees strong demand through 1H27 and double-digit QoQ growth in 4Q26 and 1Q27. Thread had no replies.
Delta Electronics captures the AI server power discrete and supply step, with AI exposure expected to exceed 60% by 1Q27 after around 50% in 2026, while power-discrete shortages hold shipments until at least 2Q27.
2026-11-23 · @desk
+8
Hyosung forms dedicated SST team for 800 V AI halls
Hyosung Heavy Industries formed a dedicated solid-state transformer team in its R&D center for AI data center power equipment. On 16 Nov it signed an MoU with SK Telecom to supply 345 kV substation equipment and jointly pilot 800 V DC distribution. Reply noted the practicality of SST for data-center power.
Hyosung Heavy Industries captures the solid-state transformer step for AI data centers, forming a dedicated SST team and signing an MoU with SK Telecom on 16 Nov 2026 to supply 345 kV equipment and pilot 800 V DC distribution.
2026-11-22 · @desk
+8
Renesas samples dual-side-cooled 650 V GaN for 800 V IBCs
Renesas released a 650 V, 20 mΩ d-mode GaN FET on Gen 4+ in an 8×8 mm dual-side-cooled PQFN for AI data centers. Sampling now to OEMs and ODMs, mass production mid-2027, for intermediate bus converters from 800 V DC. Thread had no replies.
Renesas captures the dual-side-cooled 650 V GaN power stage for 800 V-to-low-voltage intermediate bus converters in AI racks, sampling now to OEMs and ODMs with mass production planned for mid-2027.
2026-11-21 · @desk
+8
Tesla ships Powercore for medium-voltage to 800 Vdc in 2027
Tesla unveiled Powercore, a solid-state platform combining transformer, breaker and inverter that converts medium-voltage AC directly to 800 Vdc for data centers. First units operating in 2027, collaborating with Nvidia. Replies were mostly cheerleading.
Tesla captures the medium-voltage to 800 Vdc solid-state transformer, inverter and breaker step with Powercore (7.4 MW / 9 MVA), first units operating in 2027, collaborating with Nvidia on 800 Vdc data-center architectures.
2026-11-20 · @desk
+8
Panasonic targets March 2027 CBU mass production for 800V racks
Nomura maps next-gen AI data-center power stacks with Mt Diablo OCP and 2H27 Rubin Ultra / Kyber-era 800V racks making dedicated CBUs part of the architecture. Panasonic logged JPY 114.9B in 2Q data-center battery sales and targets March 2027 mass production for its first-gen CBU. Thread had no replies.
Panasonic captures the first-gen CBU step for next-gen AI power racks, targeting March 2027 mass production, as Mt Diablo OCP and 2H27 Rubin Ultra / Kyber-era 800V racks make dedicated CBUs part of the architecture.
2026-11-19 · @desk
+8
Infineon supplies CoolSiC G2 to Megmeet for 800V AI shelves
Infineon and Megmeet collaborate on 800VDC AI data-center power architectures. Megmeet will use Infineon’s CoolSiC MOSFETs G2 in its three-phase power shelf, covering server PSUs, IBCs and SSTs. Thread had no replies.
Infineon captures the CoolSiC MOSFET G2 step in Megmeet’s three-phase AI power shelf for 800VDC architectures, covering server PSUs, IBCs and SSTs, announced 19 Nov 2026.
Printed
- Issue 01 · Electrification
+6The current is the chainNVIDIA captures the chip. The building captures the current. Price the phase, not the logo.
- Issue 02 · Physical AI
The body is a reducerAssembler is not the industry. The reducer is. Sit Tsu and Hotaka, then sit the qualification calendar.
- Issue 03 · Cross-book
+8Watt and handDo not pick a winner in the logo layer. Pick the step that cannot be skipped, and the year it starts to print.
Next to sit
Next
The SST certification calendar
After 2029 is a slide. The desk wants the cert, the SiC, and who eats the transformer.
Queue
Un-caging the cell
Sourcing is step one. Thousands of hours under thermal load is the gate that ships volume.
Queue
The park that iterates overnight
Harmonic, servo, and force sensor in one drive. That velocity is the second book on the body.
Method
01
Break on X
The chart, the thread, the first map. That is the desk’s inbound.
02
Sit the comments
The missing column usually lives under the post. Margin. Who. When.
03
Pull the sources
SemiAnalysis, the vendor note, the GTC tape. No logo soup.
04
Write the view
One sentence that can sit on the canvas. Price the phase, not the logo.
05
Draw the chain
Steps, who captures, when it prints. The building, not the brand.
06
Cut the briefing
A night voice note. Walk the chain in under four minutes.
07
Cut the short
Nine by sixteen. One line. Then YouTube, then TikTok.
House
Sit the next issue. Print the chain.
A house underwrites one map — electrification, physical AI, the picks that do not trend until the assembler does.